We’ve all walked along the beach, felt the waves crash, and felt the increased resistance beneath our feet as we tried to lift free and take another step.  These forces of nature can be subtle and beautiful, but what if we could use them and truly harness the ferocity nature can provide? One force acting on your feet below the water, increasing the resistance to taking the next step, is suction. We engineers have asked how we can access more of this suction power, maximising physics for mankind's benefit. Engineering a solution for our needs.


For years, we’ve been toying with the idea of extracting wind power. However, only recently have we been able to scale these wind structures to match the scale of infrastructure we humans have built over a millennium. Putting these wind turbines offshore has been a touch of genius, since wind speeds are much higher out there. Ensuring they are robustly anchored to the seafloor and don’t overturn or float away remains a challenge we are still working on. However, advances are gaining traction, and although many solutions exist, the more technologically advanced seabed-connection options come with their own challenges. For example, one can install a large hollow steel tube, which has great merit. The noise created is a challenge, but the overall benefit is warranted. Another option in much deeper water is developing a method to fix cross-braced structures to the seabed using suction. These structures are installed using suction pressure and stay in place because the suction locks them in. The figure below shows a wind turbine foundation supported by a suction caisson. Note that when you’re at sea, on a boat, or flying overhead, this part isn't just submerged; some of it is in the water!


Three leg jacket with suction caisson goundations credit Orsted
Three-legged jacket with Suction Caisson foundations, Borkum Riffgrund 1 offshore windfarm in Germany (credit Orsted)

Foundations for the Seagreen offshore wind farm UK
Pre-installation image of Offshore Wind jacket and Suction Caisson foundations, Seagreen Offshore Wind farm (Credit: Trevon Joseph & Precedent Consultants)

Suction Caisson pot-installation load cases

We’ve demonstrated in past blogs how they are installed, which is half of the challenge. The next part is ensuring they're fit for purpose after installation. This means they must withstand wind (offshore wind farm!), waves, currents, earthquakes, and more. You can’t change the soil. What's there stays; the design changes for each case.



Uprooting resistance comes from the combination of stresses around the suction caissons. The caisson needs to be strong enough not to be pushed deeper into the soil, so this is another requirement. The caisson is also rotated, pushed over, and twisted in all directions. The resistance provided by the suction caisson comes from complex physics solved with mathematical rigour and engineering precedent, developed over years to ensure our trusted investments hold steadfast while meeting our energy demands.


Unfortunately, our well-engineered structures are rarely seen again. From the moment they are lowered onto the seabed, suction-pressured to the required depth, grouted, and protected from scour, they stay for at least 25 to 30 years. All those hours of joyful engineering lead to a successful project, but you can never drive along with the family and say, "This is what you’ve done, or how you’ve contributed." Still, knowing you’ve contributed to the development of society and mankind should be enough to feel grateful for!


Whether you're in the initial feasibility phases or optimising an operational asset, our experts are here to assist. Time to set a precedent? Please reach out, as we have the key expertise in this field. Visit www.precedentconsultants.com to learn more about our services or to schedule a call to discuss your project needs.

 

Key references

  • Andersen, K.H., Jostad, H.P. and Dyvik, R., 2008. Penetration resistance of offshore skirted foundations and anchors in dense sand. Journal of geotechnical and geoenvironmental engineering, 134(1), pp.106-116.

  • DNV, 2021, "Offshore soil mechanics and geotechnical engineering," Recommended Practice DNV-RP-C212, September 2019 (Amended September 2021), DNV AS, Oslo, Norway.

  • Houlsby, G.T. and Byrne, B.W., 2005a. Design procedures for installation of suction caissons in sand. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering, 158(3), pp.135-144.

    Houlsby, G.T. and Byrne, B.W., 2005b. Design procedures for installation of suction caissons in clay and other materials. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering, 158(2), pp.75-82.

  • Joseph, T., Mallikarachchi, H., Gütz, P., Hamdan, N., Powell, T. and Jones, L., 2023, September. Mitigation of Suction Caisson Installation Refusal by Two-Way Cycling–Part I. In SUT Offshore Site Investigation and Geotechnics (pp. SUT-OSIG). SUT.

  • Zuccarino, L., Brandolini, C., Piatti, C. and Gioffrè, D., 2024, June. New Site Specific CPT-based Suction Bucket Jacket Installation Coefficients from Field Measurements. In ISOPE International Ocean and Polar Engineering Conference (pp. ISOPE-I). ISOPE.